Duke Medical Center Library & Archives News Tag: building

Record with ease at the Audio/Video Recording Studio
Posted On: Thursday, April 24, 2025 - 08:35 by Megan Von Isenburg

Are you looking to record high-quality podcasts? Or do you need to produce video lectures? Our audio/video studio is designed to cater to a variety of recording needs. Whether you're preparing a lecture, creating a podcast, or developing training sessions, our suite of software tools—including Audacity, Camtasia 22, Coolcam, Zoom, and NCD video recorder—will support your project from start to finish.

Located on Level 3, Room 322, our studio is equipped with the technology you need to ensure your recordings are professional and polished. The studio features a Lenovo ThinkCentre running Windows 10, an Osborn 4k camera with AI and remote capabilities, and a 40-inch LG mounted display. For superior sound quality, we have a Shure Stem wall sound bar, complemented by a wireless…

MORE

Tags: building, services

Replacement of Lower Level Air Handling Units
Posted On: Tuesday, July 16, 2024 - 08:43 by Beverly Murphy

A building wide HVAC upgrade began on November 8, 2023 and will continue through the December 2024. 

Mon. 8/5-Wed. 8/7 (starting at 6a) Air handling unit 4 will be replaced but no impact on air flow comfort. Occupants may be impacted by significant noise but mostly on 8/5/24.

Mon. 8/12-Fri. 8/16 (starting at 6a) Air handling unit 3 return fan will be replaced but no impact on air flow comfort. Occupants may be impacted by significant noise but mostly on 8/13/24.     

Fri. 8/23-Sun. 8/25 (starting at 6a) Air handling unit 3 will be replaced and there will be no air flow to Level 2 during this time. Temporary cool units will be put in place but occupants may not be as comfortable as in normal operation.…

MORE

Categories: Alerts

Tags: building

HVAC System Upgrade
Posted On: Friday, October 27, 2023 - 15:55 by Beverly Murphy

A building wide HVAC upgrade will affect the Medical Center Library & Archives beginning November 8, 2023. Work will continue through the summer and may result in temperature disruptions and construction noise. We appreciate your patience throughout this project!

Categories: Alerts

Tags: building

Now Open: Audio/Video Recording Studio
Posted On: Thursday, August 25, 2022 - 11:38 by Megan Von Isenburg

Creating high quality recordings for a podcast, class, or interview can be a challenge on a busy medical campus. Our new Audio/Video Recording Studio, which features acoustic wall panels and recording equipment, is designed to make it easier.

The Audio/Video Recording Studio is located in Room 322 on Level 3 of the Medical Center Library & Archives and is available for reservation Monday – Friday from 8:30 am to 4:30 pm. Once you have a reservation, stop by our Service Desk to check out the key to the room.

Equipment includes a Lenovo ThinkCentre with Windows 10, Osborn 4k camera with…

MORE

Categories: Explore Tools, Resource Updates

Tags: multimedia, podcasts, building, services

Find Your Favorite Space!
Posted On: Thursday, August 25, 2016 - 01:38 by Beverly Murphy

 A couple of years ago, we moved over 3,000 linear feet of bound journals and steel shelving on Level 3 to make room for more study space.

This space includes:
• 11 individual carrels that can seat up to 2 people, with doors for privacy
• 2 open carrels
• 3 group study rooms (rooms 315, 316, 319)
Mestro Care terminals (room 320)
• 10 “Resolve Units” with 3 individual work surfaces
• Casual seating

In addition to Level 3, we have a variety of other study spaces available in the Library. On

MORE

Tags: building