Duke Medical Center Library & Archives Blog
Tag: building

HVAC System Upgrade
Posted On: Friday, October 27, 2023 - 15:55 by Beverly Murphy

A building wide HVAC upgrade will affect the Medical Center Library & Archives beginning November 8, 2023. Work will continue through the summer and may result in temperature disruptions and construction noise. We appreciate your patience throughout this project!

Categories: Alerts

Tags: building

Now Open: Audio/Video Recording Studio
Posted On: Thursday, August 25, 2022 - 11:38 by Megan Von Isenburg

Creating high quality recordings for a podcast, class, or interview can be a challenge on a busy medical campus. Our new Audio/Video Recording Studio, which features acoustic wall panels and recording equipment, is designed to make it easier.

The Audio/Video Recording Studio is located in Room 322 on Level 3 of the Medical Center Library & Archives and is available for reservation Monday – Friday from 8:30 am to 4:30 pm. Once you have a reservation, stop by our Service Desk to check out the key to the room.

Equipment includes a Lenovo ThinkCentre with Windows 10, Osborn 4k camera with…

MORE

Categories: Explore Tools, Resource Updates

Tags: multimedia, podcasts, building, services

Find Your Favorite Space!
Posted On: Thursday, August 25, 2016 - 01:38 by Beverly Murphy

 A couple of years ago, we moved over 3,000 linear feet of bound journals and steel shelving on Level 3 to make room for more study space.

This space includes:
• 11 individual carrels that can seat up to 2 people, with doors for privacy
• 2 open carrels
• 3 group study rooms (rooms 315, 316, 319)
Mestro Care terminals (room 320)
• 10 “Resolve Units” with 3 individual work surfaces
• Casual seating

In addition to Level 3, we have a variety of other study spaces available in the Library. On

MORE

Tags: building